Replacement of the badly rundown bridge that carries the 390 expressway over Trolley Boulevard in Gates is going to take longer than expected. The Monroe County Highway Superintendent says Trolley Boulevard will close tomorrow morning…and be shut down for about 15 months.
Gates Supervisor Mark Assini says the original estimate was three months. He says traffic between Lee Road and Long Pond Road will be allowed up to the bridge for people to reach their homes, but there will be no through traffic for more than a year.